Steel Plant For Tyre Production & Industrial Warehousing

2024-02-24
Case Detail
Project Usage Tyre Production & Industrial Warehousing
Building Structure Type 2 floors,each floor 10m height & with 10-ton bridge crane supporting structure on ground floor
Building Size Total area:41,000 sqm,length 176m,width 116m,column spacing 11m.
Steel Structure Weight 2,900 tons of main steel frame,650 tons of secondary steel.
Working Scope

1Design 3D TEKLA model,fabrication drawings,installation drawings

2.Fabrication of steel structure & roof/wall steel panel

3.Installation

Project Location Qingdao,China
Date October,2022-June,2023

 